*
= Due to operational errors, the metric has been corrected manually (!=SSB).
--
= Errors on weekends are ignored on Site Readiness computation for T2s [+info]
"Site Readiness Status" as defined in Site Commissioning Twiki:
"Daily Metric" as boolean AND of all invidual metrics:
R
= READY
O
= OK (All individual metrics above Site Commissioning Thresholds; "n/a" ignored)
W
= WARNING
E
= ERROR (Some individual metrics below Site Commissioning Thresholds)
NR
= NOT-READY
SD
= SCHEDULED-DOWNTIME
SD
= SCHEDULED-DOWNTIME
- INDIVIDUAL METRICS -
"Maintenance": Sites scheduled downtimes
"HammerCloud":
"Good Links":
Up
= Site is not declaring Scheduled-downtime
= HC success rate is ≥ 80%
= at least half of links have 'good' transfers (i.e. with transfer quality > 50%)
SD
= full-site in SD OR all CMS SE(s) in SD OR all CMS CE(s) in SD
= HC success rate is < 80%
= Otherwise
~
= Some SE or CE services (not all) Downtime
-
= Jobs submitted but not finished
UD
= full-site in UD OR all CMS SE(s) in UD OR all CMS CE(s) in UD
n/a
= HC success rate is n/a
"SAM Availability":
"Active T2 links to T1s":
= SAM availability is ≥ 80%
= Site has ≥ 2 DDT-commissioned links to T1 sites
= SAM availability is < 80%
= Otherwise
"Active T2 links from T1s":
= Site has ≥ 4 DDT-commissioned links from T1 sites
= Otherwise