*
= Due to operational errors, the metric has been corrected manually (!=SSB).
"Site Readiness Status" as defined in Site Commissioning Twiki:
"Daily Metric" as boolean AND of all invidual metrics:
R
= READY
O
= OK (All individual metrics above Site Commissioning Thresholds; "n/a" ignored)
W
= WARNING
E
= ERROR (Some individual metrics below Site Commissioning Thresholds)
NR
= NOT-READY
SD
= SCHEDULED-DOWNTIME
SD
= SCHEDULED-DOWNTIME
- INDIVIDUAL METRICS -
"Maintenance": Sites scheduled downtimes
"HammerCloud":
"Good Links":
Up
= Site is not declaring Scheduled-downtime
= HC success rate is ≥ 90%
= at least half of links have 'good' transfers (i.e. with transfer quality > 50%)
SD
= full-site in SD OR all CMS SE(s) in SD OR all CMS CE(s) in SD
= HC success rate is < 90%
= Otherwise
~
= Some SE or CE services (not all) Downtime
-
= Jobs submitted but not finished
UD
= full-site in UD OR all CMS SE(s) in UD OR all CMS CE(s) in UD
n/a
= HC success rate is n/a
"SAM Availability":
"Active T1 links from T0":
= SAM availability is ≥ 90%
= Link from T0_CH_CERN is DDT-commissioned
= SAM availability is < 90%
= Otherwise
"Active T1 links from/to T1s":
"Active T1 links to T2s":
= Site has ≥ 4 DDT-commissioned links from and to, respectively, other T1 sites
= Site has ≥ 20 DDT-commissioned links to T2 sites
= Otherwise
= Otherwise